Pages

Monday, November 29, 2021

An 800 MW power station can be established at Idukki, says pre-feasibility study

Taking the combined installed capacity of the Idukki hydroelectric power project to 1580 MW, the scheme is designed to address the long-term power demands of the State

from The Hindu - National https://ift.tt/3rjpVXU
via alochona

No comments:

Post a Comment